This thoughtfully designed 992-square-foot ADU offers a comfortable and efficient layout with two bedrooms and two bathrooms, including a private primary suite with a walk-in closet. The open living room and kitchen create an inviting central gathering space, while the secondary bedroom and bath provide flexibility for guests, family members, or a home office. Covered porch and patio areas extend the living space outdoors and add everyday functionality to the compact design.
A standout feature of this plan is the attached 752-square-foot two-car garage, providing generous space for vehicles, storage, hobbies, or workshop use. The exterior presents a clean, approachable residential character with a low-profile roofline, traditional detailing, and a welcoming covered front porch. With its combination of efficient living space, private bedroom accommodations, and an exceptionally spacious garage, this ADU is well suited for multigenerational living, guest accommodations, or an independent secondary residence.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Manual J, D, and S
These are engineering calculations used to properly design the heating and cooling system for a home.
Together, these help support comfort, energy efficiency, and overall system balance.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.