This thoughtfully designed 1,402-square-foot single-story home offers three bedrooms and two bathrooms in an efficient layout suited to comfortable everyday living. The open living room connects naturally with the kitchen and breakfast nook, creating an inviting central space for meals, relaxation, and casual entertaining. The private primary suite includes its own bathroom, while two secondary bedrooms share a conveniently located full bath. A covered rear patio extends the living area outdoors and provides a welcoming setting for dining or recreation.
The exterior showcases timeless Ranch-inspired character with a broad horizontal profile, low tile rooflines, warm stucco finishes, and an understated covered entry. An exceptionally spacious 954-square-foot three-car garage provides abundant room for vehicles, storage, recreational equipment, or workshop use. With its practical floor plan, inviting indoor-outdoor connection, and generous garage capacity, this home offers an appealing blend of comfort, functionality, and classic curb appeal.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Manual J, D, and S
These are engineering calculations used to properly design the heating and cooling system for a home.
Together, these help support comfort, energy efficiency, and overall system balance.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.
Structural calculations prepared by an engineer that verify the roof framing (trusses) can safely support all required loads, including the weight of the roof, wind, and seismic forces.
These are typically provided by the truss manufacturer and submitted with the plans for approval.
(California Energy Compliance)
A required report that shows a home or building meets California’s energy efficiency standards. It evaluates items such as insulation, windows, lighting, and heating and cooling systems to help confirm the project is energy-efficient and compliant with state requirements.
Including BMPs (Best Management Practices)
These plans show how the land will be shaped and graded so water drains properly away from structures and does not create flooding, ponding, or site drainage issues. They also identify erosion control measures, often called BMPs, such as silt fences, stabilized soil, or other protections used during construction.
(Water Quality Management Plan / Project-Specific Stormwater Plan)
These plans address how stormwater runoff will be handled on a property to help prevent pollution. They may include drainage systems, filtration areas, retention features, or other measures required by local agencies to keep runoff controlled and properly managed.
Detailed plans showing the layout and design of a fire sprinkler system. These are usually prepared by a licensed fire protection designer or contractor and submitted separately to help confirm the building meets applicable fire safety requirements.