Asen Auto Incorporated

LOCATION: Hesperia, CA
PROJECT TYPE: Automotive
SCOPE: Full Construction Documents
SQUARE FOOTAGE: 13,813 sq ft
STORIES: 2
DETAILS
Designed to make a bold first impression, this contemporary automotive facility combines modern industrial architecture with highly functional workspace design to support today’s growing automotive service and collision repair industry. The clean exterior lines, premium metal panel finishes, and striking architectural elements create a professional image that reflects quality, performance, and innovation.

Share This Project:

Facebook
Twitter
Pinterest
Scroll to Top

City of Adelanto Requirements

Plan Submittal Method: Electronic (online submission)

By Omega Design Group

  • Full set of Architectural drawings
  • Structural engineering
  • Truss calculations What is this?
  • Title 24 State energy calculations What is this?

By Our Consultants

Civil Engineer*

  • Grading / Erosion control plan What is this?
  • PCMP (2500 sf of impervious surface and over + within MS4 Phase 2 boundary) What is this?

Geotechnical Engineer

  • Perc testing (approved by EHS) What is this?

Additional Requirements:

  • Fire sprinkler plans What is this?
  • Solar plans What is this?
* Client can choose their own consultant for these services if desired.

Town of Apple Valley Requirements

Plan Submittal Method: Electronic (online submission) OR
Over-the-counter (in-person review)

By Omega Design Group

  • Full set of Architectural drawings
  • Structural engineering
  • Truss calculations What is this?
  • Title 24 State energy calculations What is this?
  • Landscaping plans What is this?
  • Duct Calcs What is this?

By Our Consultants

Civil Engineer*

  • Grading / Erosion control plan What is this?
  • PCMP (2500 sf of impervious surface and over + within MS4 Phase 2 boundary) What is this?

Geotechnical Engineer

  • Perc testing (approved by EHS) if site is located within dry lake / soils report area What is this?
  • Soils report if site is located within dry lake / soils report area What is this?

Additional Requirements:

  • Fire sprinkler plans What is this?
  • Solar plans What is this?
* Client can choose their own consultant for these services if desired.

City of Hesperia Requirements

Plan Submittal Method: Over-the-counter (in-person review)

By Omega Design Group

  • Full set of Architectural drawings
  • Structural engineering
  • Truss calculations What is this?
  • Title 24 State energy calculations What is this?
  • Gas Isometrics What is this?

By Our Consultants

Civil Engineer*

  • Grading / Erosion control plan What is this?

Additional Requirements:

  • Fire sprinkler plans What is this?
  • Solar plans What is this?
* Client can choose their own consultant for these services if desired.

City of Victorville Requirements

Plan Submittal Method: Electronic (online submission)

By Omega Design Group

  • Full set of Architectural drawings
  • Structural Engineering
  • Truss calculations What is this?
  • Title 24 State energy calculations What is this?
  • Gas Isometrics What is this?
  • Landscaping plans What is this?

By Our Consultants

Civil Engineer*

  • Grading / Erosion control plan What is this?
  • PCMP (2500 sf of impervious surface and over + within MS4 Phase 2 boundary) What is this?

Geotechnical Engineer

  • Perc testing (approved by EHS) What is this?

Additional Requirements:

  • Fire sprinkler plans What is this?
  • Solar plans What is this?
* Client can choose their own consultant for these services if desired.

San Bernardino County Requirements

Plan Submittal Method: Electronic (online submission)

By Omega Design Group

  • Full set of Architectural drawings
  • Structural engineering
  • Truss calculations What is this?
  • Title 24 State energy calculations What is this?

By Our Consultants

Civil Engineer*

  • Grading / Erosion control plan What is this?
  • PCMP (2500 sf of impervious surface and over + within MS4 Phase 2 boundary) What is this?

Geotechnical Engineer

  • Perc testing (approved by EHS) What is this?
  • Soils report or alternate method form* What is this?

Additional Requirements:

  • Fire sprinkler plans What is this?
  • Solar plans What is this?
* Client can choose their own consultant for these services if desired.